Lattice craneSuperstructure

Superstructure

I worked a lot on this part. I made several versions. There is not so much place in the boxes.


Color choice

I had already choose Boom and carrier color. Then the only possible color was yellow (free parts...). At begining, superstructure was completely yellow, but it looks very massive. Then I created the black line to decorate the model.

Superstructure and boom locking
Fixing rigidity - dismantability

Superstructure is easily removable from carrier. It's fit on the carrier's turntable and lock by three red axle 12. Internal design of superstructure is a bit complicated by this choice, because I need to left free space for axle to go through.
Superstructure internal faces, near the winches, are made with strong stacking (beam, plate, plate, beam...), and is beam interlocking.

Boom and A-frame are removable : boom with a red axle, A-frame with 2 technic friction pins.


Cabin : 2 versions

As the crane is a mix between two different models (crawler crane Terex and telescopic crane Demag), I had some scale inconsistencies. Superstructure scale was 1/22 and truck is 1/17, then driver cabin was too small. I rebuilt it bigger and now it looks fine.First version ready to use

First cabinSecond cabin : 1/17

I also add a driver and a new seat. Seat is adjustable.


High torque winch driveWinches : 3 versions

Superstructure is made in 3 parts : left box with driver cabin, middle part with winches, and right box. In each box are placed winche's drives. In first version, there were only 3 winches. To wind up cables I use wheel rim, without tyre. I need great demultiplication to drive winches. You can see here the most compact reduction I can make. You get a strong torque, but it's quite slow (on big winches there is more than 15m of wire ! Wind up time are long !).

Gear boxI tried to manage a gear box with 2 speed. It works, but frictions are important, and brake the drive. The speed isn't higher than first version, and I lost lot of torque.

Then I made a new version, with 4 winches ! Boxes are completely full with drives, reductions, electric switches and wire, axles way...

4 winches !


Decoration

On top of boxes, I put klaxon, lights, exhaust pipe and winches control lever.

Decoration and control lever
Central counterweightCounterweights

The crane has 3 removable counterweights : a central one plus 2 auxiliaries. They are separately transported, in order to maintain the truck under 12mTon by axle on the road. Installation procedure is : 1. Crane is placed and take off on its outriggers. 2. main boom is fixed and lift. 3. Central counteweight is take from transport truck to the crane, and put just behind A-fram tackletruck's cabin. 4. auxiliary couterweights are fix to the central one. 5. superstructure turn and take off counteweight.

See her counterweight loading

Counterweight are Lego boxes, fill up with lead blocks, especially cast in fitting dimensions.

 

 


Lego pulleysA-frame

A-frame is use to lift boom. It doesn't need to work fast, but to be very strong (it works in compression mode). I use pulleys demultiplication (10 pulleys). Those pulleys cause me lot of problems. I started using Lego pulleys, fixed with this technic pin :Part 3749
But pulleys are overhanging and don't turn easily under charge. As I dont want to modify Lego parts, I have built myself specific pulleys. They are thin, loose pulleys, with a big gorge.

More superstructure photos.


Home

Second carrier 

 Crane summary
 Booms